Base Frame Covers; Drive Motor Cover - Installation; Battery Charger Cover - Installation; Drive/Elevation Cut-Out Switch Installation - JLG 15MVL Series Service Maintenance Manual

Hide thumbs Also See for 15MVL Series:
Table of Contents

Advertisement

SECTION 3 - BASE COMPONENTS

3.2 BASE FRAME COVERS

Drive Motor Cover - Installation

Drive Motor Cover Installation
1. Cover
2. Attach Screws and Wash-
ers (a)
NOTE: (a) Apply Loctite #242 to screw threads before
tightening.

Battery Charger Cover - Installation

Batttery Charger Cover Installation
1. Charger Cover
2. Front Attach Screws
and Washers
3-2
3. Set Cover Tab on Lower
portion of Cover, in Slot on
Base Frame
3. Rear Attach Screws
and Washers - Loosen
Only - Cover Slotted
– JLG Lift –
3.3 DRIVE/ELEVATION CUT-OUT SWITCH
INSTALLATION
Drive/Elevation Switch Cut-Out Switch Installation
1. Mounting Screws (a)
2. Proximity Switch (b)
NOTE: Elevate and block platform to gain access to
switch.
(a) Apply Loctite #242 to mounting screw
threads on final assembly.
3. Switch Mounting Block
4. Frame Mounting Holes
3121231

Advertisement

Table of Contents
loading

This manual is also suitable for:

20msp series20mvl series15msp series

Table of Contents