Installation; Unpack And Inspection; Placement; Dry-Out Period - Fluke 9118A User Manual

Calibration furnace
Table of Contents

Advertisement

9118A
Users Manual

Installation

The subsequent sections give you information on best
practices for Product installation.

Unpack and Inspection

Carefully unpack the Product and check for all parts. If
there is damage, tell the shipper immediately and make a
claim. The parts included are:
9118A Calibration Furnace
Type-S Thermocouple, Long
Type-S Thermocouple, Short
Protection Tube, Long
Protection Tube, Short
TC Support Bracket
L-Key, Hex 3 mm
Button Head Screw, M5X12 (2 each)
Getting Started Manual
Users Manual CD-ROM
Ground Wire
Serial Cable
USB Cable
Super Wool Insulator
Calibration Certificate
6
Isothermal Block
Rear Plug
Rear Plug for backup
The last 3 items are only for the thermocouple calibration
furnace with isothermal block.

Placement

For best results, choose a location to setup the Product
where room temperature changes are minimum. To safely
remove heat, put the Product in a position with a minimum
of 45 cm of free air space around it.
Fluke Calibration recommends that you do a test for axial
uniformity and adjust if necessary after the Product is
installed. Temperature uniformity of the Product could be
affected by the environment where the Product operates or
by equipment or material placed inside or at the ends of
the central tube. Refer to the Calibration section of this
manual.

Dry-Out Period

Before initial use, after transport, or the Product has not
been energized for more than 10 days, turn on the Product
for a minimum of 2 hours.
If the Product is wet or was in a wet environment, remove
moisture before you turn on the Product.

Advertisement

Table of Contents
loading

Table of Contents