Installation; Unpacking; Location; Power - Fluke 9116A User Manual

Table of Contents

Advertisement

3

Installation

3.1

Unpacking

Verify that the following components are present:
• Furnace
• Control HTPRT and Cutout Thermocouple
• Heat Radiation Guard (Quartz tube packed separately)
• Fixed Point Basket
• Fixed Point Basket Lid
• Fixed Point Basket removal tool
• Sodium Heat Pipe
• Circular 1.27 cm (0.5 in) fiber ceramic board (already installed in fur-
nace)
• Top thermal shunt disk
• Bottom thermal shunt disk (already installed in furnace)
• Extra Insulation:
Unpacking should be done carefully. Several parts are packed disassembled for
safe shipment. Small parts may be packed in a separate box inside the crate.
Check carefully for all parts. If there is any damage due to shipment, notify
your carrier immediately.
3.2

Location

A furnace of this type is typically installed in a calibration laboratory where
temperature conditions are generally well controlled. Best results will be ob-
tained from this type of environment. Avoid the presence of flammable materi-
als near the furnace. Allow 6 or more inches of air space around the furnace.
Adjust the levelers on the bottom of the furnace to level the furnace and to keep
it from rocking.
3.3

Power

The 9116A furnace power requirements are listed in Section 2.1 on page 7. The
furnace is supplied with a 14-gauge, 2-conductor plus ground cable and con-
nector. Since building electrical installations may vary, the connector and cable
may be removed at the furnace back panel and another used so long as it is
Fiber ceramic insulating paper for the fixed point cell
Small circles for fixed point basket
Miscellaneous for packing around the fixed point cell
Circular 1.27 cm (0.5 in) fiber ceramic board
9

Advertisement

Table of Contents
loading

Table of Contents