Sign In
Upload
Manuals
Brands
Fluke Manuals
Furnace
9116A
Fluke 9116A Manuals
Manuals and User Guides for Fluke 9116A. We have
1
Fluke 9116A manual available for free PDF download: User Manual
Fluke 9116A User Manual (80 pages)
Brand:
Fluke
| Category:
Furnace
| Size: 3 MB
Table of Contents
Table of Contents
3
Before You Start
7
Introduction
7
Symbols Used
7
Safety Information
8
Warnings
8
Cautions
10
Authorized Service Centers
11
Specifications and Environmental Conditions
13
Specifications
13
Environmental Conditions
13
Installation
15
Unpacking
15
Location
15
Power
15
Figure 1. Furnace Core Diagram
16
Plumbing
17
Heat Pipe Installation
17
Figure 2 HTPRT Control Probe and Cutout Thermocouple Wire Routing and Heat Pipe Ground Wire Placement
19
Figure 3 Attachment of Thermocouples
21
Parts and Controls
22
Control Panel
22
Controller
22
Figure 4. Front Control Panel (Cover Door Remove)
22
Furnace Core
23
Access Well
25
Back Panel
25
General
26
Sodium Heat Pipe Information
26
Minimum Temperature and Heat-Up Rate
26
Safety Precautions
26
Controller Operation
27
Well Temperature
27
Reset Cut-Out
27
Figure 6. Controller Flow Chart
28
Temperature Set-Point
29
Programmable Set-Points
29
Set-Point Value
30
Scan
30
Scan Control
30
Scan Rate
30
Ramp and Soak Program Menu
31
Number of Program Set-Points
31
Set-Points
32
Program Soak Time
32
Program Function Mode
33
Program Control
33
Secondary Menu
34
Heater Power
34
Proportional Band
34
Figure 7. Proportional Band Settings
35
Cut-Out
36
Controller Configuration
37
Probe Parameters
37
Alpha
37
Delta
37
Operating Parameters
37
Temperature Scale Units
38
Cut-Out Reset Mode
38
Approach
38
Soak Stability
39
Serial Interface Parameters
39
Baud Rate
39
Sample Period
39
Duplex Mode
40
Linefeed
40
IEEE-488 Parameters
41
IEEE-488 Address
41
Termination
41
Calibration Parameters
42
Cto
42
CO and CG
42
Sco
42
Digital Communication Interface
43
Serial Communications
43
Wiring
43
Setup
43
Figure 8. Serial Cable Wiring
43
Baud Rate
44
Sample Period
44
Duplex Mode
44
Linefeed
44
Serial Operation
44
IEEE-488 Communication
45
Setup
45
IEEE-488 Interface Address
45
Interface Commands
45
Table
47
Fixed Point Cell Installation Instructions
50
Installing the Metal Freeze Point Cell
50
Purpose
50
Figure 9. Metal Freeze Point Cell Installed in Canister
51
Procedure
52
Figure 10 Cell Supported by Stand
52
Figure 11 Cotton Gloves MUST be Used
53
Figure 12 Preparing Paper Towel with Reagent Grade Alcohol
54
Figure 13 Clean Cell Completely
55
Figure 14 Place Insulation in Re-Entrant Well
56
Figure 15 Push Insulation to Bottom of Re-Entrant Well
57
Figure 16 Clean the Basket Thoroughly
58
Figure 17 Place Insulation in Cell Basket
59
Figure 18 Insure the Insulation Is Flat at the Bottom of the Cell Basket
60
Figure 21 Insert Cell into Basket
63
Figure 23 Fiber Ceramic Insulation Installed on Top of Cell
65
Figure 24 Fiber Ceramic Paper Pushed below Cell Basket Top
65
Figure 25 Preparing Basket Assembly for Installation in Furnace
66
Figure 26 Installing Basket Assembly in Furnace
67
Figure 27 Width of Insulation Placed on Top of Basket Assembly
68
Figure 28 Basket, Insulation, and Furnace Lid Installed
69
Figure 29 Heat Radiation Guard Installed
70
Freeze Point Realization
71
General
71
How to Realize the Freezing Point of Copper
71
Calibration Procedure
73
Two Point Calibration Procedure
73
Compute R & ALPHA
73
Accuracy & Repeatability
74
Maintenance
75
Figure 30. Testing Uniformity
76
Troubleshooting
78
Troubleshooting
80
Advertisement
Advertisement
Related Products
Fluke Hart Scientific 9150
Fluke 9112A
Fluke 9118A
Fluke 9140
Fluke 9103
Fluke 9143
Fluke 9172-E-156
Fluke 9173-C-R-156
Fluke 9173-F-R-156
Fluke 9171-E-156
Fluke Categories
Measuring Instruments
Test Equipment
Multimeter
Thermometer
Laboratory Equipment
More Fluke Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL