Suzuki WagonR+ RB310 Service Manual page 1892

Table of Contents

Advertisement

6A-30 ENGINE MECHANICAL
4) Install rubber seal between oil pump and water pump.
5) Install key (2) and crank timing belt pulley (3). Refer to figure
1. Dowel pin
(crankshaft pulley pin)
6) Install timing belt, tensioner, oil pump strainer, oil pan and other
7) Check to ensure that all removed parts are back in place.
8) Adjust water pump drive belt tension, referring to "ENGINE
9) Adjust A/C compressor belt tension, if equipped.
10) Refill engine with engine oil, referring to item "ENGINE OIL
11) Connect negative cable at battery.
12) After completing installation, check oil pressure by running en-
for proper installation of these parts.
With crankshaft locked using flat end rod or the like (5), tighten
crank timing belt pulley bolt (4) to specified torque.
Tightening Torque
.
(a): 130 N
m (13.0 kg-m, 94.0 lb-ft)
parts as previously outlined.
Reinstall any necessary parts which have not been reinstalled.
COOLING" section.
Refer to SECTION 1B.
CHANGE" in SECTION 0B.
gine.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Wagonr+ rb4130Wagonr+ rb413

Table of Contents