Setting Tillage Depth
1. Fully lift the equipment frame by fully extending
and re-phasing the frame lift cylinders.
NOTE: Re-phase lift cylinders at the start of each work
day (see Rephasing Rockshaft Cylinders on
page 90).
NOTE: The following process with need to be done to
both rockshaft hitch cylinders and to the LH
wing rear attachment rockshaft cylinder.
Figure 148
2. Remove the quick release pin (1, Figure 148).
Figure 149
3. Adjust the number of depth stop plates (1, Figure
149)
working depth (see Blade Depth Guide on page
158).
4. Install quick release pin (2).
1
B-17123
Operation - High Speed Compact Disc
1
recommended to achieve a specified
2
B-17123
87