Installing/Removing The Battery - Sokkia X-1000 series Operator's Manual

Intelligence x-ellence station
Table of Contents

Advertisement

• Slots 1 and 2:
The charger starts charging the battery mounted first. If you place two batteries in the charger, the battery in
slot 1 is charged first, and then the battery in slot 2. (
• Charging lamp:
The charging lamp is off when the charger is outside the charging temperature range or when the battery is
mounted incorrectly. If the lamp is still off after the charger falls within its charging temperature range and the
battery is mounted again, contact your local dealer. (
• Charging time per battery:
BDC70:about 5.5 hours (at 25°C) (Charging can take longer than the times stated above when temperatures
are either especially high or low).
6.2

Installing/Removing the Battery

Mount the charged battery.
Type of power source: "23. POWER SUPPLY SYSTEM"
• Use the attached battery (BDC70).
• Before removing the battery, turn off the power to the instrument. If the battery is removed while the power is
switched on, a warm boot may occur. File and folder data may be lost as a result.
• Do not open the battery cover while the power is on.
• Do not damage the projected sensor inside the battery cover. Also, be careful not to shut the battery cover
on your fingers.
• When installing/removing the battery, make sure that moisture or dust particles do not come in contact with
the inside of the instrument.
• Remove batteries from the surveying instrument or charger before putting into storage.
PROCEDURE Mounting the battery
1. Slide down the catch on the battery cover to open.
2. Checking the terminal side on the battery, insert the
battery as shown.
• Do not insert the battery inclined. Doing so may damage
the instrument or battery terminals.
3. Close the battery cover. A click is heard when the cover is
secure.
step 2)
steps 2 and 3)