C H A P T E R
8 –
F R O N T
R u n S c r e e n
Once a program is loaded into the AT5600, connect the transformer to the fixture
and press the Run button to begin testing the transformer. When testing is
complete, you will see the following display:
• RESULTS
• COMPENSATE
Compensation again, if you wish
• SN/BATCH/ OP
test, Batch Number, and Operator Number. The soft-key is enabled only if
the option(s) are selected in the test program
• FINISH
AT5600 User Manual 98-119 issue 14
P A N E L
O P E R A T I O N
show the results of the test
used to perform an Open, Short or Load
used to change the serial number of the part under
return to the top-level screen
Page 182
Need help?
Do you have a question about the AT5600 and is the answer not in the manual?