Part List - Voltech AT5600 User Manual

Wound component tester
Hide thumbs Also See for AT5600:
Table of Contents

Advertisement

C H A P T E R
8 –
F R O N T
8.1.6.
This is the normal operating mode of the AT5600 when used for production
testing of transformers.
Before you try to use the tester in EXECUTE Mode, make sure that all the
following have been carried out:
• Test programs have been created for the transformers you wish to test.
• The programs are stored in the AT Server, which is connected to the tester
and running, and the tester has been set up to use the Server via either
ETHERNET or RS232
• Fixtures have been created for the transformers you wish to test.
To access EXECUTE Mode, from the top-level menu, tap the soft-key PART LIST
to change to the following display:
• ACCEPT – to load the selected test program
• BACKSPACE - clears the last character entered
• PAGE UP – Page up the list of programs
• PAGE DOWN – Page down the list of programs
• CANCEL – return to the top-level screen
• SYNC P/N LIST – Gets a fresh list of programs from the AT Server. This
list (but NOT the actual program) is stored in the AT5600 so only needs
SYNC if the list changes. This speeds up navigation. The actual ATP test
program will always be fetched from the Server, never stored in the unit.
AT5600 User Manual 98-119 issue 14
P A N E L
O P E R A T I O N

PART LIST

Page 172

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AT5600 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF