Starting The General Commissioning - Siemens Sinamics G120 CU240E Operating Instructions Manual

Table of Contents

Advertisement

4.5.3

Starting the general commissioning

Description
● When the final dialog box in the "Going online" section is closed, the text "Offline mode"
● For modular frequency inverters that comprise a Control Unit and Power Module, when
● Select and acknowledge message F0395 that is present as described in the Section
● Open the drive unit (
● Click on "Wizard ..." for the (basic) commissioning, and let the Wizard guide you.
Frequency inverter
Operating Instructions, 08.10. 2008, t.b.d.
in the bottom right of the dialog box changes to "Online mode".
Figure 4-11
Going online with STARTER (example with SINAMICS G120)
first powered-up and after replacing a control unit or a Power Module, message F0395 is
output. This message is intentional and does not indicate that the inverter is faulty. This
message monitors the individual frequency inverter components (CU and PM) against
unauthorized replacement.
"Initial coupling of the CU and PM".
Note
For information about the symbols used in STARTER, call up the online help. Press
<Shift><F1> and choose the relevant symbol. For example:
), by double clicking on the drive object ( )
Commissioning
4.5 Commissioning with STARTER
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120 cu240s pn-fSinamics g120 cu240s dpSinamics g120 cu240s pnSinamics g120 cu240sSinamics g120 cu240s dp-f

Table of Contents