Voltage Input Connections - Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

Appendix A - Installing RTP
3. Set/verify jumper positions on each RTP as shown.
4.
198
Module Removal / Insertion Under Power (RIUP) is supported by turning off
Switch SW1 to allow removal of the module from the rack without causing an
arc.
ATTENTION: SW1 opens current loop on the ground side so that RIUP of
module is possible, but voltage is still present on the positive side at RTP
and module terminals.
See "RTP Cable wire positions, colors, and internal schematic" on page 219 for
more information.
Connect field wiring. Refer to the appropriate figure for your type of analog
input.
Figure A-10: Voltage input connections