4. Repeat for each rack in the system.

Module Insertion

When inserting a module, carefully align the card with the rack. Press
the module to ensure that the backplane connector is fully inserted.
Secure the module to the rack using the top and bottom screws.
Ensure that the screws are properly secured.

Assembling the Redundant Controller Rack

To assemble the Redundant Controller Rack assembly: