Installation Tools; Site And Equipment Preparation - Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

Table 5-3: Installation tools
Types
Item
Common
Wire strippers
tools
Crimper
Screwdrivers Small flat-tip
Small/medium flat-tip or #2
Phillips or 3/16 inch slotted
screwdriver
Large (long blade)
Other
Electric drill, with drill bits for
#10 or M4 screws, and with drill-
bit extender
Vacuum cleaner, brush
Pen, ball-point or felt-tip, for
entering data on labels for I/O
modules)
Multi-Meter (Volt/Ohms/Amps)
Soldering pencil or gun (for
attaching filter capacitors to I/O
wiring shields)
Preparing the installation site
Table 5-4: Site and equipment preparation
Step Procedure
1
Racks (4-, 8- and 12-slot)
2
Install (or verify correct installation of) enclosures for
CPM and ancillary equipment:
Description
For Power Supply and for I/O
Wiring
For Terminal Lugs on Power
Supply wiring and on I/O wiring
shields
For Euro-style Terminal Blocks
For Barrier style Terminal blocks;
also for captured screws in
Terminal Blocks
For use as I/O Module extractor
For rack mounting
For use during and after drilling
operations
For entering data on labels for I/O
modules
For safety checks and for
equipment test
For attaching filter capacitors on
I/O wiring shields
For more
information, see
Mount racks
Mount racks
Installing I/O
section.
section
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents