Mount Racks - Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

Step Procedure
3
Install (or verify correct installation of):
External disconnect switches
l
Fuses at the power source associated with input
l
sensor or output devices for I/O modules
4
Arrange and organize items to be installed at or near
enclosures.
66

Mount racks

ATTENTION: Never mount racks vertically, or with the backplane
horizontal, or upside down.
Figure 5-9: Incorrect rack mounting direction
CAUTION: Mark hole locations then either remove or cover any
equipment below to ensure metal chips generated from drilling /
tapping do not migrate causing electrical hazard or damage.
1. Mount the Rack in the enclosure by completing these steps:
a. Using the diagrams below as a guide, mark the locations for the
top holes in the rack.
For more
information, see
Installing I/O
modules
section

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents