Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual page 68

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

68
included, attach them with two M3 screws (supplied with
grounding bars in plastic bag), as shown below.
ATTENTION: The plastic bag also includes four M4 screws
for attaching the grounding wire lugs, which are attached
later. Attach the M4 screws loosely to the grounding bars
for safe keeping.
3. Hang the rack in the enclosure on the top screws, as shown below.
Install the mounting screws in the bottom of the rack, then tighten
all screws.
CAUTION: Postpone this step until all components have
been installed in the rack.