Led Indications On Plc-Cpm - Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

Table 3-5: LED Indications on PLC-CPM
Item LED
1
Status
2
Role
3, 5,
Ethernet Port
7, 9
Speed ( Upper
LED)
26
LED
Description
State/Color
OFF
No Power is applied to CPM.
On/Green
The controller is working normally.
On/Red
The controller is stopped.
On/Orange
The controller is in power-up process.
Blinking Red
The controller is running with error.
@ 1HZ
Blinking Red
The controller is accessible via online
@ 0.5HZ
communication, but no application is
loaded.
Blinking Red
IP address is in conflict.
@ 5HZ
Blink @ 1HZ /
The controller is upgrading firmware.
Green &
Orange
OFF
It is a non-redundant system or;
On/Green
The controller is in primary role and the
system is synchronized, or;
On/Orange
The controller is in secondary role and
the system is synchronized.
Blinking
The controller is in primary role and the
Green @ 1HZ
system is synchronizing.
Blinking
The controller is in secondary role and
Orange @
the system is synchronizing.
1HZ
Blinking
The controller is in primary role and the
Green @
system is unsynchronized.
0.5HZ
Blink Red @
The controller is in secondary role and
0.5HZ
the system is unsynchronized.
Yellow On/Off
OFF for 10Base-T; ON for 100Base-TX.