Satec System 295 Installation And Operation Manual page 118

Powermeter & harmonic analyzer
Table of Contents

Advertisement

Measurement Specifications
Parameter, unit
×
Voltage, V
120V
@ 120V
×
380V
@ 660V
×
208V
@ 120V
×
660V
@ 660V
Line current, A
CT primary current
×
Active power, kW
0.36
×
1.14
×
Reactive power,
0.36
kvar
×
1.14
×
Apparent power,
0.36
kVA
×
1.14
Power factor
1
Neutral current, A
CT primary current
Auxiliary current,
Auxiliary CT primary
mA/A
current
110
Full scale
Rdg
PT
For Ln reading
and for
or
3OP2/3OP3
PT
wiring modes
PT
For LL reading
except
or
3OP2/3OP3
PT
wiring modes
×
PT
CT
@ 120V input
×
PT
CT
@ 660V input
×
PT
CT
@ 120V input
×
PT
CT
@ 660V input
×
PT
CT
@ 120V input
×
PT
CT
@ 660V input
Accuracy, %
FS
Conditions
0.2
10% to 120%
0 to 999,000
FS
0.2
2% to 120%
0 to 60,000
FS
|PF| ≥ 0.5 •
0.5
0 to
± 2,147,000
|PF| ≤ 0.9 •
0.5
0 to
± 2,147,000
|PF| ≥ 0.5 •
0.5
0 to 2,147,000 1 kVA
|PF| ≥ 0.5
1
-0.99 to +1.00 0.01
0.5
0 to 60,000
2% to 120%
FS
1
2% to 120%
0 to 60,000
FS
Resolution @ range
Range
Front panel display
1 V
@ 1 to 999 V
≤ 1%
@ 1,000 to 999,000 V
1 A
@ 1 to 9,999 A
≤ 0.1% @
10,000 to 60,000A
1 kW
@ 1 to 99,999/-9.999
≤ 0.01%
@ 100 to 2,147 MW
≤ 0.1%
@ - 10 to -2,147 MW
@ 1 to 99,999/-9.999
1 kvar
≤ 0.01%
@ 100 to 2,147Mvar
≤ 0.1%
@ - 10 to -2,147 Mvar
@ 1 to 9,999
≤ 0.1%
@ 10 to 2,147 MVA
1 A
@ 1 to 999 A
≤ 1%
@ 1,000 to 60,000 A
1 mA/A
@ 1 to 999 mA/A
≤ 1%
@ 1,000 to 60,000
Technical Specifications
Comm.
1 V
1 A
1 kW
1 kvar
1 kVA
0.01
1A
1 mA/A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm295

Table of Contents