Step 2. Meet Electrical And Environmental Requirements - HP 8712ET User Manual

Rf network analyzers
Hide thumbs Also See for HP 8712ET:
Table of Contents

Advertisement

CAUTION
NOTE
Figure 1-1
Installing the Analyzer

Step 2. Meet Electrical and Environmental Requirements

Step 2. Meet Electrical and
Environmental Requirements
1. Set the line voltage selector to the position that corresponds to the ac
power source you will be using.
Before switching on this instrument, make sure that the line voltage
selector switch is set to the voltage of the mains supply and the correct
fuse (T 5 A 250 V) is installed. Assure the supply voltage is in the
specified range.
The working fuse and a spare are located in the power cable receptacle.
See
Figure 7-13 on page
Voltage Selector Switch Location
1-4
7-24.
ET User's Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hp 8714et

Table of Contents