CAUTION
NOTE
Figure 1-1
Installing the Analyzer
Step 2. Meet Electrical and Environmental Requirements
Step 2. Meet Electrical and
Environmental Requirements
1. Set the line voltage selector to the position that corresponds to the ac
power source you will be using.
Before switching on this instrument, make sure that the line voltage
selector switch is set to the voltage of the mains supply and the correct
fuse (T 5 A 250 V) is installed. Assure the supply voltage is in the
specified range.
The working fuse and a spare are located in the power cable receptacle.
See
Figure 7-13 on page
Voltage Selector Switch Location
1-4
7-24.
ET User's Guide