4. Commissioning
4.4
Checklist for commissioning
Festo P.BE-CTEU-DN-OP+MAINT-EN en 1206NH
Observance of the following points helps you to avoid errors
during commissioning on DeviceNet.
Finally check the DIL switch settings again.
•
Check the address assignment of the inputs and outputs.
•
Check the configured address range (process data and
assigned input and output bytes).
Test the inputs and outputs if necessary.
•
Check the parameterisation, via the configuration pro-
•
gram for example.
Make sure that the desired parameterisation is restored
•
after a restart or after fieldbus interruptions.
4-19