Setup And Installation; Connecting The Electromechanical Units - NT-MDT NTEGRA Spectra Instruction Manual

Inverted configuration with renishaw spectrometer
Hide thumbs Also See for NTEGRA Spectra:
Table of Contents

Advertisement

NTEGRA Spectra Probe NanoLaboratory. (Inverted Configuration with Renishaw Spectrometer).

7. Setup and Installation

The NTEGRA Spectra PNL is put into operation by an authorized person after installation.

7.1. Connecting the Electromechanical Units

ATTENTION! Before connecting or disconnecting any parts of the
instrument, power off the controller. Any connections during the instrument
operation may result in damage of the electronic circuitry.
The NTEGRA Spectra PNL instrument operates under control of two controllers, main and
slave. The main controller model depends on the size of the exchangeable mount -
BL222NNTF (BL222RNTF) for the 50-m or BL227NNTF (BL227RNTF) for 100-m
exchangeable mount. The slave controller model is BL222SS.
Commutation schematic of NTEGRA Spectra PNL is shown in Fig. 7-1. Below, the
procedure on connection of electromechanical units is explained.
Fig. 7-1. Commutation schematics of the NTEGRA Spectra electromechanical units
To connect electromechanical units, perform the following steps:
1. Connect the following
the base unit:
a. connector of the cable of the exchangeable mount (pos. 1 on Fig. 7-2);
26
connectors to the
SCAN+SENSOR
socket of
SCAN+SENSOR

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents