5. Setup and Installation
5.1. Interface Board Installation
Normally the control PC is supplied with the pre-installed interface board. If the control
PC is supplied separately, the interface board can be installed by either a certified
installation engineer or by the customer.
To install the interface board:
1. Disconnect the control PC from the wall outlet.
2. Open the PC case.
3. Select an empty PCI slot on the motherboard.
4. Remove (unscrew) the gap closure from the selected slot. Insert the interface board
accurately into the slot against stop. Make sure the board is installed in the slot evenly
without any skew.
5. Fix the interface board using the screw from the gap closure.
6. Make sure no cords and wires touch the board. If necessary, properly fasten loose cords
inside the PC case.
7. Close the PC case and connect it to the wall outlet.
5.2. Software Installation
Install the Nova control program. Proceed as follows:
1. Insert the installation disk into the CD-drive.
2. Run file setup.exe. The screen will display the dialog box of the setup wizard. To
install the software follow the instructions of the wizard.
Upon finishing the installation a shortcut to the Nova program will appear on the desktop.
NOTE. The details of the software installation are discussed in the manual «SPM
Software».
Chapter 5. Setup and Installation
17