6. General Requirements on Installation

NTEGRA Spectra PNL is a precise optical device. Special requirements on the work room,
on the power supply system, and on the optical table should be met.
NTEGRA Spectra PNL should be installed in a dark room of area of 12 m
room must be equipped both with ceiling lighting and with a separate source of weak
scattered light.
A system of thermal stabilization or, at least, of good ventilation should be provided.
Remember that an operating laser can disperse up to 4 kW of heating power.
Keep dust concentration as low as possible.
The electric wiring of the room must meet the following requirements:
at least 8 standard voltage sockets for mains 220 V/50 Hz with the total power
of 1 kW. These are used to supply the microscope, the spectrometer, the controllers,
computers and monitors;
Other supply voltage lines are defined by the user.
The CCD-camera Andor needs water cooling for operation. Thus, the corresponding
infrastructure must be provided in the room.
The PNL is mounted on an optical table of dimensions 2x1 m
net of threaded connections М5 (grid pitch 50 mm).
Chapter 6. General Requirements on Installation
2
or bigger with a standard
2
2
(3×4 m
). The
25