Verifying Switch Operations - Allied Telesis IE200 Series Installation Manual

Industrial ethernet switches
Hide thumbs Also See for IE200 Series:
Table of Contents

Advertisement

Verifying Switch
Operations
5. Wait a minimum of one minute for the switch to initialize its operating
system.
To monitor the console messages as the device initializes the
management software, go to "Monitoring the Initialization Process" on
page 94.
Here are several items to check to verify that the switch is operating
normally. If there is a problem, refer to Chapter 6, "Troubleshooting" on
page 101 for suggestions on how to resolve it.
The Fault LED should be off.
One or both PWR 1 and PWR 2 LEDs should be solid green,
depending on the number of DC power supplies connected to the
unit.
The LEDs on SFP slots with transceivers connected to active
network devices should be solid or flashing green.
The Link LEDs on twisted pair ports connected to active network
devices should be solid or flashing green or amber. The Link LEDs
are identified in Figure 10 on page 42 and Figure 11 on page 44.
The PoE LEDs on the AT-IE200-6FP and AT-IE200-6GP Switches
should be solid green on ports connected to PoE or PoE+ devices.
The PoE LEDs are identified in Figure 11 on page 44.
After verifying the operations of the switch, go to "Starting a Local
Management Session" on page 96.
IE200 Series Installation Guide
93

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie200-6ftAt-ie200-6fpAt-ie200-6gtAt-ie200-6gp

Table of Contents