Installation Check List; Applying Power To The Timeprovider 5000; Normal Power Up Indications; Installation Completeness Checklist - Symmetricom TimeProvider 5000 User Manual

Ieee 1588 grand master clock / ntp server
Hide thumbs Also See for TimeProvider 5000:
Table of Contents

Advertisement

The unit is now powered up.

Installation Check List

To verify that the installation of the TimeProvider 5000 is complete, perform the
checks and procedures in
Table 2-9. Installation Completeness Checklist
Ensure the TimeProvider 5000 chassis is securely attached to mounting rack
Ensure that the appropriate modules (and filler panels if needed) are installed
Verify that all power and ground wires are installed correctly and securely
Verify that all communications cables are properly installed
Verify that all input and output cables are properly installed
Note:
User's Guide for the E1 / 1PPS+TOD expansion shelf or the
PTP / SyncE expansion shelf.

Applying Power to the TimeProvider 5000

The TimeProvider 5000 is not equipped with a Power switch. DC power is controlled
by a power distribution panel. After installing the unit in a rack and making the
necessary connections described in previous sections, turn on power at the
distribution panel.

Normal Power Up Indications

As the TimeProvider 5000 powers up and begins normal operation, the
and IMC module LEDs all turn on. After the module self-test is complete and the
module firmware is operational, the LED states may change to indicate the
appropriate state or status.
Table 2-10
provides a description of the module LEDs.
description of the expansion shelf LEDs.
098-00028-003 Revision A – June, 2011
Table
2-9.
Operation
For details on installing expansion shelves, see the
Chapter 2 Installing
Installation Check List
Complete
IOC module
Table 2-11
provides a
TimeProvider 5000 User's Guide
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents