Operation Flowchart (Continued 1) - JCM GLOBAL VEGA Series Operation And Maintenance Manual

Table of Contents

Advertisement

Section 2
Operation Flowchart
Figure 2-15 depicts a typical VEGA Banknote acceptance flow process.
Figure 2-15 VEGA Banknote Validator Opera-
tional Flowchart (Acceptance)
Power ON
a
b
NO
c
YES
e
NO
f
YES
g
h
NO
i
YES
NO
j
YES
k
A
Figure 2-15 VEGA Banknote Validator Operational Flowchart (Acceptance)
P/N 960-100189R_Rev. 4 {EDP #148850}
VEGA™ Series Banknote Validator
D
C
d
B
2 - 8
a) Initializing
b) Stand-by
c) Enable Accept?
d) LED Display No Accept Pattern
e) LED Display shows Enable Accept 
Pattern
f) Is Banknote inserted?
g) Banknote transporting and 
sampling
h) Stop Transportation (Escrow position)
i) Is Banknote Validation OK?
j) Is Banknote Acceptable?
k) Provide Denomination Signal Output
A) To Stacker 
(See Figure 2-16 on page 2-9)
B) To Reject 
(See Figure 2-17 on page 2-10)
© 2016, JAPAN CASH MACHINE CO., LTD.
Installation

Hide quick links: