Stacker Belt Removal; Figure 4-23 Stacker Unit Removal (Part 1); Figure 4-25 Cash Box Turn Course Removal; Figure 4-26 E-Ring, Gear & Clutch Shaft Removal - JCM GLOBAL VEGA Series Operation And Maintenance Manual

Table of Contents

Advertisement

Disassembly/Reassembly

Stacker Belt Removal

To remove the VEGA Unit's Stacker Belts, 
proceed as follows:
1. Open the Cash Box Door (Figure 4-23 a) and
remove the two (2) Mounting Screws located
inside the Cash Box (Figure 4-23

Figure 4-23 Stacker Unit Removal (Part 1)

b
1
Figure 4-23 Stacker Unit Removal (Part 1)
2. Carefully spread both upper sides of the Cash
Box apart (Figure 4-24 a) and gently pull the
Pusher Unit forward (Figure 4-24 b) out of the
Cash Box (Figure 4-24 c).
Figure 4-24 Stacker Unit Removal (Part 2)
b
c
Figure 4-24 Stacker Unit Removal (Part 2)
NOTE: Be careful not to lose the seven (7)
Drive Gears (Figure 4-24 d) from the Cash
Box when removing the Pusher Unit.
3. Remove the two (2) Mounting Screws (Figure 4-
25
a
&
a
) retaining Cash Box Turn Course
1
2
located on each side of the Pusher Unit (Figure 4-
25 b).
4. Pull the Cash Box Turn Course off the Pusher
Unit (Figure 4-25 c).
P/N 960-100189R_Rev. 4 {EDP #148850}
VEGA™ Series Banknote Validator
b
&
b
).
1
2
b
a
a
d

Figure 4-25 Cash Box Turn Course Removal

a
2
2
Figure 4-25 Cash Box Turn Course Removal
5. Remove the single (1) E-Ring with single (1)
Bushing (Figure 4-26 a) from left end of the Box
Drive Shaft.
6. Remove the two (2) E-Rings (Figure 4-26
b
), the two (2) Gears (Figure 4-26
2
the two (2) Set Pins (Figure 4-26
on the right side of the Pusher Unit (Figure 4-26
e).
7. Slide the Crank Drive Shaft (Figure 4-26 f) out of
the Pusher Unit.
Figure 4-26 E-Ring, Gear & Clutch Shaft
Removal
a
f
Figure 4-26 E-Ring, Gear & Clutch Shaft Removal
NOTE: Be careful not to lose each Bushing
or Slider retained by the parts removed in
above steps when removing the parts.
8. Remove the two (2) Mounting Screws (Figure 4-
27
a
&
a
) retaining the Right Cash Box Link
1
2
Frame (Figure 4-27 b) to the center Ceiling Board
Assembly (Figure 4-27 c), and separate the Right
Cash Box Link Frame from the Ceiling Board.
9. Remove the single (1) Stacker Belt with its
related Pulleys (Figure 4-27 d) from the right side
of the Right Cash Box Link Frame.
10. Remove the single (1) Set Pin (Figure 4-27 e)
retaining the Shaft in the Ceiling Board Assem-
bly.
© 2016, JAPAN CASH MACHINE CO., LTD.
4 - 7
Section 4
b
a
1
c
b
&
1
c
&
c
) and
1
2
d
&
d
) located
1
2
b
c
1
1
d
1
b
2
c
d
2
2
e

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents