Figure 4-3 Upper Assembly Separation (Part 1); Figure 4-5 Front Bezel Removal; Figure 4-6 Flap Positioning Spring Removal; Figure 4-7 Shaft And Flap #1 & #2 Removal - JCM GLOBAL VEGA Series Operation And Maintenance Manual

Table of Contents

Advertisement

Section 4
Figure 4-3 Upper Assembly Separation (Part
1)
b
1

Figure 4-3 Upper Assembly Separation (Part 1)

8. While lifting up on the Upper Transport Unit
(Figure 4-4 a), gently widen one side of the
Lower Transport Unit hinge area (Figure 4-4 b),
and separate the Upper Transport Unit from the
Lower Transport Unit.
Figure 4-4 Upper Assembly Separation (Part
2)
a
b
Figure 4-4 Upper Assembly Separation (Part 2)
9. Pull the Front Bezel (Figure 4-5 a) forward and
off the Upper Transport Unit (Figure 4-5 b).

Figure 4-5 Front Bezel Removal

Figure 4-5 Front Bezel Removal
P/N 960-100189R_Rev. 4 {EDP #148850}
VEGA™ Series Banknote Validator
a
b
2
c
b
a
10. Remove the two (2) Flap Positioning Springs
(Figure 4-6
a
&
1
Transport Unit (Figure 4-6 b).

Figure 4-6 Flap Positioning Spring Removal

a
1
Figure 4-6 Flap Positioning Spring Removal
11. Remove the single E-Ring (Figure 4-7 a) from the
end of the Flap Axis (Figure 4-7 b).
12. Slide the Flap Axis containing the mounted left
Flap Lever (Figure 4-7 c) and remove the right
(Figure 4-7 d) and left Flap Lever from the Flap
Axis end.
13. Carefully remove the Flap 1 (Figure 4-7 e) and
Flap 2 (Figure 4-7 f) up and off the Upper Trans-
port Unit.
Figure 4-7 Shaft and Flap #1 & #2 Removal
f
e
a
d
Figure 4-7 Shaft and Flap #1 & #2 Removal
NOTE: When re-attaching the Right Flap
Lever, ensure that the retaining pin portion
of the left Flap Lever (Figure 4-8 a)
securely fits into the Flap 1 mating hole
(Figure 4-8 b) and the corresponding pin of
the right Flap Lever (Figure 4-8 c) fits into
Flap 2 mating hole (Figure 4-8 d).
© 2016, JAPAN CASH MACHINE CO., LTD.
4 - 2
Disassembly/Reassembly
a
) from the side of the Upper
2
a
b
b
c
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents