Operational Flowchart - JCM GLOBAL TBV Series Integration Manual

Transaction based validator
Table of Contents

Advertisement

7 OPERATIONAL FLOWCHART

Figure 15 depicts a typical TBV Banknote acceptance flow process.
P/N 960-100925R_Rev. A {EDP #186705}
Transaction Based Validator Integration Guide
Figure 15 TBV Operational Flowchart
1 6
Power applied to the Unit.
B) Return from "t" or "u" Functions below
a) Initializing
A) Return from "p" or "r" Functions below
b) Has ENABLE Command been 
Received?
c) Stand-by
d) Turn the Intake Sensor ON?
e) Transport the Banknote?
f) Sampling a Banknote's Data
g) Sampling Completed
h) Is the Banknote Authentic?
i) Is Denomination Settings un-inhibited?
j) Output the Denomination Value Signal
k) Was a STACKING Command 
Received?
l) Start Transporting a Banknote
q) Return the Banknote
m) Banknote Transportation Complete
r) Is the Banknote Return Complete?
n) Output a VEND Signal
s) Output a JAM ERROR Signal
o) Start Stacking
p) Is the Cash Box Full?
t) Signal to Change the Cash Box
u) Remove a Jammed Banknote
A) Return to "c" Function at top
B) Return to "a" Function at top
© 2010, Japan CashMachine Co, Limited

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tbv-100 fsh

Table of Contents