Wiring
!
64
4.2.3

Cable specification for connecting cable

Only use the connecting cables supplied by Endress+Hauser.
The connecting cables are available in different lengths  ä 92.
For the cable specifications, see  ä 119.
Operation in areas with strong electrical interference
The measuring system complies with the general safety requirements in accordance with
EN 61010, the EMC requirements of IEC/EN 61326 "Emission as per Class A requirements" and
NAMUR Recommendation NE 21.
4.3

Connecting the measuring unit

Field instruments can be connected to the FOUNDATION Fieldbus in two ways:
• Connection via conventional cable gland  ä 65
• Connection using prefabricated fieldbus connector (option)  ä 66
4.3.1

Terminal assignment

Note!
The electrical characteristic quantities are listed in the "Technical data" section.
Terminal No. (inputs/outputs)
Order version
20 (+) / 21 (–)
93***-***********G
-
93***-***********K
-

With integrated reverse polarity protection
Proline Prosonic Flow 93 FOUNDATION Fieldbus
22 (+) / 23 (–)
24 (+) / 25 (–)
-
-
-
-

26 = FF +

27 = FF –
FOUNDATION
Fieldbus Ex i
FOUNDATION
Fieldbus
Endress+Hauser