Premounting The Strapping Bands (Large Nominal Diameters) - Endress+Hauser Proline Prosonic Flow 93 Operating Instructions Manual

Foundation fieldbus ultrasonic flow measuring system
Hide thumbs Also See for Proline Prosonic Flow 93:
Table of Contents

Advertisement

Proline Prosonic Flow 93 FOUNDATION Fieldbus
Endress+Hauser
3.7.4

Premounting the strapping bands (large nominal diameters)

When mounting on a pipe with a nominal diameter of DN  200 (8")
For sensors:
• Prosonic Flow 93P (DN 50 to 4000 / 2 to 160")
• Prosonic Flow 93W
Procedure
1.
Measure the pipe circumference.
2.
Shorten the strapping bands to one length (pipe circumference + 32 cm (12.6 in)) and trim the
cut edges.
#
Warning!
Risk of injury. To avoid sharp edges, trim the cut edges after shortening the strapping bands.
First strapping band
3.
Fit the mounting bolt over the strapping band.
4.
Wrap the strapping band around the pipe without twisting it.
5.
Guide the end of the strapping band through the strapping band lock (strapping screw is
pushed up).
6.
Tighten the strapping band as tight as possible by hand.
7.
Set the strapping band to the desired position.
8.
Push down the strapping screw and tighten the strapping band so that it cannot slip.
Second strapping band
9.
Proceed as for the first strapping band (steps 3 to 8). Only slightly tighten the second strapping
band for final mounting. It must be possible to move the strapping band for final alignment.
3.
Fig. 23:
Premounting strapping bands for pipe diameters DN > 600 (24")
1
Mounting bolt with guide*
2
Strapping band*
2
Strapping screw
* Distance between mounting bolt and strapping band lock min. 500 mm (20 in)
i n )
( 2 0
m m
0 0
³ 5
Installation
A0015461
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proline prosonic flow pProline prosonic flow w

Table of Contents