Installing An Expansion Board In The Primary Riser Cage - HPE ProLiant DL360 User Manual

Hide thumbs Also See for ProLiant DL360:
Table of Contents

Advertisement

Expansion boards (Installing an expansion board in the primary riser cage on page 71)
Controllers (Controller options on page 82)
12. Install the primary PCI riser cage (Install the primary PCI riser cage on page 27).
13. Install the access panel (Installing the access panel on page 25).
14. Install the server in the rack.

Installing an expansion board in the primary riser cage

Prerequisites
Before installing this option, be sure you have the following:
The components included with the hardware option kit
Procedure
1.
Observe the following alerts:
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
2.
Back up all server data.
3.
Power down the server (Power down the server on page 24).
4.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5.
Do one of the following:
a. Extend the server from the rack (Extend the server from the rack on page 24).
b. Remove the server from the rack (Remove the server from the rack on page 25).
6.
Remove the access panel (Remove the access panel on page 25).
7.
Remove the primary PCI riser cage (Removing the primary PCI riser cage on page 27).
8.
Remove the expansion slot blank.
Installing an expansion board in the primary riser cage
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents