•
4 LFF
12. Install the access panel (Installing the access panel on page 25).
13. Install the server in the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server (Powering up the server on page 24).
Installing an HPE Smart Array P816i-a Controller option
Prerequisites
Before installing this option, be sure that you have the following:
•
The components included with the hardware option kit
•
Additional cables, as required. For more information, see Cabling on page 114
•
T-15 Torx screwdriver
Installing an HPE Smart Array P816i-a Controller option
87