9.
Install the access panel (Installing the access panel on page 25).
10. Install the server in the rack.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server (Powering up the server on page 24).

HPE Smart Storage Battery option

In the Hewlett Packard Enterprise DL360 Gen10 Server , the Smart Storage Battery can be installed in two
different orientations, depending on configuration:
Installing a Smart Storage Battery in 8 SFF and 4 LFF configurations on page 104
Installing a Smart Storage Battery in the 10 SFF SAS/SATA/NVMe Combo backplane configuration
on page 105

Installing a Smart Storage Battery in 8 SFF and 4 LFF configurations

Prerequisites
Before installing this option, be sure you that have the components included with the hardware option kit.
Procedure
1.
Power down the server (Power down the server on page 24).
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Do one of the following:
a. Extend the server from the rack (Extend the server from the rack on page 24).
b. Remove the server from the rack (Remove the server from the rack on page 25).
4.
Remove the access panel (Remove the access panel on page 25).
5.
Install the Smart Storage battery and connect the cable.
104
HPE Smart Storage Battery option