Commissioning

Power supply

115/230 V
Mains
adapter
0554.1084
or
18
There should always be rechargeable batteries/batteries in

Power supply, analyser box/control unit

M
AINS OPERATION
Plug mains cable into analyser box. The power supply for
the control unit is ensured when
- control unit is connected to the analyser box by the
contact strips
or
- control unit is connected to the analyser box by the spiral
BUS cable
R
ECHARGEABLE BATTERY OPERATION
The power supply for the control unit in rechargeable
battery operation is ensured when:
- control unit is connected to the analyser box by the
contact strips
or
- control unit is connected to the analyser box by the spiral
BUS cable
Control unit power supply
M
AINS OPERATION
Connect mains adapter to the control unit.
R
ECHARGEABLE BATTERY OPERATION
(art. no. 0554.0097)
or
B
ATTERY OPERATION
R
ECHARGEABLE BATTERY OPERATION WITH STANDARD
BATTERIES
Observe battery capacity.
Ensure correct polarity.
the control unit.
with battery pack