Panasonic LJ-SK56A Installation Manual page 41

Lithium-ion storage battery system
Hide thumbs Also See for LJ-SK56A:
Table of Contents

Advertisement

Clearance Space for the Installation Location
The mounting location must have the clearance space described below for installation and maintenance.
* If one side only has a minimal clearance space, make sure to allocate more space on the other side.
10 mm or longer
50 mm
or longer
300 mm or longer
Preparation for the Installation Location
<Exposed installation> Drill holes into the wall and align them with the
wiring holes on the main body.
<Semi-embedded installation> Drill holes into the wall for semi-embedded
installation.
* Provide adequate reinforcement if the
Location Check
The mounting position is as described in this manual.
The mounting location is not in the location listed "special locations."
The Network Adaptor is mounted in the correct orientation.
mounting space has been allocated.
The mounting surface is not inclined.
The mounting location has undergone the pre-mounting preparatory processing.
50 mm
or longer
500 mm or longer
strength of the wall is
Wall machining dimensions for semi-
embedded installation
Semi-embedded depth 30 mm
Wall
1 3 5 m m
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lj-sbk01Lj-na02

Table of Contents