8-5. Checking Test Run Results
Check whether the test run was completed normally.
Preparation
• Set the storage battery system to the stopped state in the normal state. The system can only be switched to the
parameter setting mode while it is in a stopped state.
Operation Procedure
Status Selection
Status 1
Status 2
or
Status 3
• Press "CLOCK (▼)"+"DATA (▲)" for three seconds in the normal state to open the status selection mode.
• Press "DATA (▲)" or "CLOCK (▼)" to display the test run status (S2).
• The first and second digit indicate the results of the Reverse Current CT test and Stand-alone test, respectively.
• The results would be [
• The actual operations cannot be performed unless the Reverse Current CT test and Stand-alone test results were
both completed normally.
8-6. Checking Battery Lot Number and Inverter Communication Status
• While the Status selection mode is selected, press "DATA (▲)" or "CLOCK (▼)" to display the test run status (S3).
• The first and second digits indicate the results of the Battery Lot Number Status and Inverter Communication Status
Communication Status, respectively.
The results would be [
• If 1st digit is not [
• Please contact the distributor if the numbers do not match.
96
or
or
] for completion and [
] for completion and [
], check Battery serial number (See 3-2 Checking the battery lot number).
+
3 sec
1 sec
: completion
: Incomplete
1st digit : Reverse Current CT Test
2nd digit : Stand-alone Operation Test
] if incomplete.
: completion
: Incomplete
1st digit : Battery Lot Number Status
2nd digit : Inverter Communication Status
] if incomplete.
Normal State
Stopped (Grid-connected)
Stopped (Stand-alone)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lj-sbk01Lj-na02

Table of Contents