Checking The Network Adaptor Connections - Panasonic LJ-SK56A Installation Manual

Lithium-ion storage battery system
Hide thumbs Also See for LJ-SK56A:
Table of Contents

Advertisement

9. Checking the Network Adaptor Connections

9-1. Checking the Network Adaptor Connections
In order to connect this system to the server via the Network Adaptor to perform remote controls, etc., the
communications with the Network Adaptor must be operating normally. Otherwise, the remote control instructions, etc.
from the server cannot be accepted.
The DR control instructions, etc. from the server cannot be accepted if the communications with the Network
Adaptor are not
properly configured.
The work must be performed
9-2. Starting Up the Network Adaptor
Preparation
• Switch the DC Protector ( ) and protection device for the storage battery system to ON.( )
Operation Procedure
• Switch ON the protection device for Network Adaptor.( )
The Network Adaptor launches and starts communicating with the storage battery system.
DC Protector
DC Protector
SB
SB
2
SB
SB
1
1
by qualified personnel.
Point of
Supply
TN or TT
system
Turn off these protection
devices in an emergency.
Stand-alone
Socket-outlet
(Type-02)
CT
Main
switch
N
PE
Protection
device for
Storage
battery
system
L
N
PE
Storage
battery
CT
system
L1
N1
PE
Switch board
Protection
device for
Network
Adaptor
L
N
PE
Network
Adaptor
COM
COM
DRED
SYS
97

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lj-sbk01Lj-na02

Table of Contents