Powering Up The Projector; Powering Down The Projector - Christie CP2000-SB Setup Manual

Hide thumbs Also See for CP2000-SB:
Table of Contents

Advertisement

Section 2: Basic Operation
2.3

Powering Up the Projector

specified voltage range.
NOTE: This is a manual power-up procedure. Some cinema installations may include an automation system
that controls lamp ignition in conjunction with other theatre variables such as house lights, audio, and the start
of the feature from a digital media storage device/server.
1. Ensure that the breakers at the main wall panel for the CP are
switched ON.
2. At the operator's side of the pedestal, set all CP2000-SB
circuit breakers to ON-these are main AC (3-phase), the
projection head (2-phase), and terminal block (single-phase).
The MAIN AC light will be green if AC is present,
components such as fans and power supplies will start up,
and the TPC will begin initializing.
3. When the TPC has initialized (approx. 15-30 seconds,
indicated by a green circle in the left corner), press the lamp
button on the TPC Main menu to ignite the lamp.
IF THE LAMP DOES NOT IGNITE:
• If a safety interlock switch is open (such as when the lamp door
is ajar), the lamp cannot be struck-the TPC lamp button will be
disabled until the interlock problem is resolved. An alarm window will also appear on the TPC.
• If the lamp fails to ignite even though the interlock system is OK, the projector will automatically re-try igni-
tion using 100% of the maximum power acceptable for the installed lamp. If this re-try also fails, a new lamp
is likely needed.
NOTE: For complete power-up troubleshooting, refer to
2.4

Powering Down the Projector

1. At the TPC, press the lamp button (on Main menu) to turn the
lamp off. You must hold the button down briefly.
2. Wait at least 10 minutes so that fans continue to cool the lamp.
Warning! Be sure to wait for the cooling fans!
3. At the operator's side of the pedestal, set all breakers to OFF.
NOTE: Manual shut-down only. Optional automation not yet
available from Christie.
2-4
Do not attempt operation if the AC supply and pedestal are not within the
Figure 2-1 Power-Up Procedure
Section 5
Troubleshooting.
Figure 2-2 Power-Down Procedure
CP2000-SB Setup Guide
020-100249-02 Rev. 1 (05-2009)

Advertisement

Table of Contents
loading

Table of Contents