Christie CP2000-SB Setup Manual page 31

Hide thumbs Also See for CP2000-SB:
Table of Contents

Advertisement

a. To create this loop, connect the OUT/warm and IN/cool hoses as described below. NOTE: Hose con-
nections may not be labeled. Be sure to depress each hose connector tab before inserting the hose end,
then release to seal (Figure 3-15). This prevents damage caused by forcing the gasket end into a closed
connector. Listen for a click.
b. The long loose hose connected to the reservoir is
the OUT/warm hose from the projection head. Con-
nect to the projection head location closest to the
non-operator's side of the projector.
c. The short loose hose connected to the heat
exchanger is the IN/cool hose. Connect to the pro-
jector head location closest to the operator's side of
the projector.
Important! To prevent damage to the sealing gasket,
always depress the connector tab when inserting the
hose end. Avoid forcing together and listen for click.
STEP 7 - Fill the Reservoir Completely (Initial Filling for Hosts Only)
After connecting the hoses, fill the cooler reservoir completely with
Christie approved coolant Jeffcool E105 provided in the liquid coolant
fill service kit (P/N 003-001837-02). Danger! HAZARDOUS SUB-
STANCE - The coolant used in this product contains ethylene glycol.
Use caution when handling. Do not ingest. Virtually all of this first sup-
ply of liquid will be drained into the hoses upon initial power-up, at
which point the reservoir must be re-filled to the correct level at the
gauge window. Refer to
STEP 8 - Check Lead Dressing & Hoses
a. At this point, integral pedestal-to-head cabling and hose connection
should be complete. Check all lead dressing and secure as neatly as
possible to prevent extra cable lengths from dangling or touching
other components. Provide proper strain relief as necessary. Ensure
hoses are free of kinks and sharp turns.
b. Connect sources and communication links at any time. Refer to
Sources
CP2000-SB Setup Guide
020-100249-02 Rev. 1 (05-2009)
Section 3.6 Initial
and
Section 3.4 Connecting for
Figure 3-15 Connecting the Hoses
Power-up.
Communications.
Section 3: Installation & Setup
Figure 3-16 Fill Reservoir
Section 3.3 Installing and Connecting
3-9

Advertisement

Table of Contents
loading

Table of Contents