POWER CABLES TO HEAD:
From behind the main AC breaker panel (within the pedestal), connect both identical power cables 34-
001992 to the IEC receptacles located near Panel B (100-230 VAC) and Panel C (200-230 VAC). Con-
nect either cable to either receptacle (these cables are interchangeable) and secure with metal strain-
relief clip provided (Figure 3-7).
Important! Components in the lamp compartment will require 200-230 VAC.
NOTE: If you prefer to use an uninterruptible power supply (UPS) for supplying power to the projection
head, route the UPS power cables through the pedestal toe and connect to the IEC receptacles on Panel B
(100-230 VAC). In this case, only one power cable provided in the pedestal is used.
g.
CHECK ETHERNET AND TPC POWER:
Within the pedestal, confirm that the power supplies for the Ethernet hub and TPC both connect to a
power bar wired to the terminal block TB2 from either the facility power source or the existing projec-
tor wiring (Figure 3-8). No other components or external equipment should be connected here.
CP2000-SB Setup Guide
020-100249-02 Rev. 1 (05-2009)
Figure 3-7 Connect Projector Breaker Power
Cables to Projection Head
Figure 3-8 Check TPC and Ethernet Hub
Connections to Power
Section 3: Installation & Setup