Christie CP2000-SB Setup Manual page 30

Hide thumbs Also See for CP2000-SB:
Table of Contents

Advertisement

Section 3: Installation & Setup
STEP 6 - Connect Two Cooling Host Ends (Pedestal-to-Head)
During operation, a closed loop of flexible tubing circulates cooling liquid stored in the pedestal to critical
electronics components located in the front compartment of the projection head. Looking into the pedestal,
the liquid will circulate counterclockwise. NOTE: The TOP graphic in Figure 3-14 is for pedestals manu-
factured before Fall 2006. The BOTTOM graphic in Figure 3-14 is for pedestals manufactured for Fall
2006 and after.
3-8
Figure 3-14 The Liquid Cooling Loop
CP2000-SB Setup Guide
020-100249-02 Rev. 1 (05-2009)

Advertisement

Table of Contents
loading

Table of Contents