Sequence Of Operations During Commissioning - Siemens SINAMICS S120 Installation And Start-Up Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Commissioning

Sequence of operations during commissioning

3.1
Sequence of operations during commissioning
Once the basic requirements have been met (see Chapter 2), you may proceed as
follows to commission the drive:
Table 3-1
Step
1
2
3
4
5
6
3.1.1
Safety guidelines
Danger
!
A hazardous voltage will be present in all components for a further 5 minutes after
the system has been shutdown.
Please follow the instructions on the component!
Caution
!
For safety reasons, Safety Integrated must be commissioned using STARTER in
online mode.
Reason:
STARTER should only be used to store the safety parameters of a project
monitoring channel. As a result, downloading a project with active Safety
Integrated results in safety problems (see Chapter 5).
3-42
Commissioning sequence
Create project with STARTER.
Configure the drive unit in STARTER.
Save the project in STARTER.
Go online with the target device in STARTER.
Load the project to the target system.
The motor starts rotating.
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
Procedure
E Siemens AG, 2004. All rights reserved
Section/
Sub-
section
3.3
3.4.4,
3.5.4,
3.6.4
3.4.4,
3.5.4,
3.6.4
3.2.2
3.4.4,
3.5.4,
3.6.4
3.4.4,
3.5.4,
3.6.4