Table 3-2
Sequence for creating a project in STARTER (example), continued
What to do?
2. Add
Operator action:
individual
–>
Double-click "Add individual drive".
drive
Device type:
Device version: 2.2x (choose one)
Bus address:
3. Configure the
Once you have created the project, you have to configure the drive unit.
drive unit
The following sections provide some examples.
E Siemens AG, 2004. All rights reserved
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
How to do it?
SINAMICS S120 (choose one)
37 (choose one)
Commissioning
Creating a project in STARTER
Comments
Information about the bus
address:
The PROFIBUS address of
the Control Unit must be set
here.
The address is set via the
address switch on the Control
Unit (or via p0918 if the
address switch = "all ON" or
"all OFF" (factory setting =
126)).
3-49