Terminal.assignment.for.cable.gland.-.Position.controller.type.8793; Terminal Assignments Of The Process Actual Value Input - Burkert 8792 Operating Instructions Manual

Electropneumatic positioner
Table of Contents

Advertisement

Type 8792, 8793
Installation
17.3. Terminal assignment for cable gland - position
controller Type 8793
First connect the process controller as described in chapter
Position Controller Type 8792.
17.3.1. Terminal assignments of the process actual value input
Input.type*
Terminal Configuration
4 – 20 mA
- internally
supplied
GND
Frequency
- internally
supplied
GND
4 – 20 mA
Frequency
- externally
supplied
Pt 100
(see information
below)
* Can be adjusted via software (see chapter Specifying the standard settings).
Table 25: Terminal assignments of the process actual value input
Connect the Pt 100 sensor via 3 cables for cable compensation reasons.
It is essential to bridge Pin 3 and Pin 4 on the sensor.
1
+24 V transmitter input
2
Output from transmitter
3
Bridge after GND (GND from 3-con-
ductor transmitter)
4
not used
GND
1
+24 V sensor supply
2
Clock input +
3
not used
4
Clock input –
GND
1
not used
2
Process actual +
3
Process actual –
4
not used
1
not used
2
Clock input +
3
not used
4
Clock input –
1
not used
2
Process actual 1 (Power supply)
3
Process actual 3 (GND)
4
Process actual 2 (Compensation)
17.2.Terminal Assignment for Cable Gland -
External.circuit
I
1
2
3
GND
1
2
4
GND
2
3
2
4
2
3
4
english
Transmitter
GND
+24 V
Clock +
Clock – (GND)
+ (4 – 20 mA)
GND
Clock +
Clock –
Pt 100
69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8793

Table of Contents