Commissioning With Operator Panel Bop-2; Display Of The Bop-2 - Siemens SINAMICS G120 Operating Instructions Manual

Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Commissioning

5.4 Commissioning with Operator Panel BOP-2

5.4
Commissioning with Operator Panel BOP-2
Remove the blind cover and snap the BOP-2 on the inverter:
5.4.1

Display of the BOP-2

Figure 5-4
56
Operator control and display elements of the BOP-2
Operating Instructions, 01/2011, FW 4.4, A5E02999804A AB
SINAMICS G120C Inverter

Advertisement

Table of Contents
loading

Table of Contents