Connecting Cables; Cabling Requirements - Sun Oracle NETRA SPARC T4-1 Installation Manual

Table of Contents

Advertisement

Connecting Cables

Perform the following tasks to connect and configure the network and serial ports
before you attempt to boot the server.
Step
Description
1.
Review the cabling requirements.
2.
Review the rear panel connectors and ports.
3.
Connect the management and data cables.
Related Information
"Rear Panel Components" on page 6
"Preparing for Installation" on page 19
"Powering On the Server for the First Time" on page 79

Cabling Requirements

Prior to cabling and powering on the server, gather the following network
information from your network administrator:
Netmask
IP address for the service processor
Gateway IP address
At a minimum, you must connect cables to these ports before powering on the server
for the first time:
SER MGT port
NET MGT port
At least one system on-board Ethernet network port
Links
"Cabling Requirements" on page 67
"Identifying Ports" on page 68
"Connecting Data and Management
Cables" on page 74
67

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NETRA SPARC T4-1 and is the answer not in the manual?

Table of Contents