Step
Description
4.
Confirm that you received all the items you
ordered.
5.
Review safety and ESD precautions.
6.
Assemble the required tools.
7.
Install any optional components that you ordered.
8.
Review the rack cautions.
9.
Install the server into either a 4-post or 2-post rack.
10.
Review cabling requirements and port information.
Attach data and management cables to the server.
11.
Prepare the power cords. Configure the Oracle
ILOM service processor, power on the server for the
first time, and boot the operating system.
Related Information
Netra SPARC T4-1 Server Product Notes
■
Netra SPARC T4-1 Server Safety and Compliance Guide
■
Server Service
■
Server Overview
The server is a carrier-grade, NEBS-certified, 2U server. The first illustration shows
the server with the air filter. The second illustration shows the server without the air
filter.
2
Netra SPARC T4-1 Server Installation Guide • January 2013
Links
"Shipping Kit" on page 19
"Handling Precautions" on page 21
"ESD Precautions" on page 21
"Tools Needed for Installation" on page 22
"Optional Components" on page 23
"Rack Cautions" on page 24
"Stabilize the Rack for Installation" on page 25
"Mounting the Server Into a 4-Post Rack" on
page 25
"Mounting the Server Into a 2-Post Rack" on
page 45
"Connecting Cables" on page 67
"Powering On the Server for the First Time" on
page 79