Power Down The Server; Remove The Server - HPE ProLiant XL250a Gen9 Maintenance And Service Manual

Table of Contents

Advertisement

Power down the server

Before powering down the server for any upgrade or maintenance procedures, perform a backup of
critical server data and programs.
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to
the system.
To power down the server, use one of the following methods:
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters
standby mode.
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the
OS. If an application stops responding, you can use this method to force a shutdown.
Use a virtual power button selection through iLO 4.
This method initiates a controlled remote shutdown of applications and the OS before the server
enters standby mode.
Before proceeding, verify the server is in standby mode by observing that the system power LED is
amber.

Remove the server

CAUTION: To prevent improper cooling and thermal damage, do not operate the chassis
unless all bays are populated with a component or a blank.
Power down the server (on page 28).
1.
Disconnect all peripheral cables from the server.
2.
Remove the server.
3.
Place the server on a flat, level work surface.
4.
Removal and replacement procedures 28

Advertisement

Table of Contents
loading

Table of Contents