While aligning the upper server tray for installation, feed the the intra-tray signal cable and the drive
2.
cable up through the space indicated for the cable routing. For information on routing the intra-tray
signal cable, see "Intra-tray signal cable routing (on page 94)." For information on routing the drive
cables, see "Drive cabling (on page 91)."
Install the upper server tray.
3.
Connect the intra-tray signal cable to the power expander board.
4.
Remove the upper tray support bracket
5.
30).
Connect and route all accelerator cables to the power expander board
6.
on page 94).
Install the upper server tray support bracket (on page 30).
7.
Install the accelerator cages
8.
Connect and route all cables for drive cage assembly 2
9.
Install drive cage assembly 2
10.
Install all drives
("Removing and replacing a
11.
Install the server into the chassis
12.
("Remove the upper server tray support
("Accelerator
(rear)" on page 44,
("Drive cage assembly
drive" on page 35).
("Install the
server" on page 33).
("Accelerator option
"Accelerator
(front)" on page 40).
("Drive
cabling" on page 91).
2" on page 58).