HPE ProLiant XL250a Gen9 Maintenance And Service Manual page 64

Table of Contents

Advertisement

Connect the intra-tray signal cable to the system board on the lower server tray.
5.
While aligning the upper server tray for installation, feed the the intra-tray signal cable and the drive
6.
cable up through the space indicated for the cable routing. For information on routing the intra-tray
signal cable, see "Intra-tray signal cable routing (on page 94)." For information on routing the drive
cables, see "Drive cabling (on page 91)."
Install the upper server tray (on page 31).
7.
Connect the intra-tray signal cable to the power expander board.
8.
Remove the upper tray support bracket
9.
30).
Connect and route all accelerator cables to the power expander board
10.
on page 94).
Install the upper server tray support bracket (on page 30).
11.
Install the rear accelerator cage
12.
Install the front accelerator cage
13.
Connect and route all cables for drive cage assembly 2
14.
Install drive cage assembly 2
15.
("Remove the upper server tray support
("Accelerator
(rear)" on page 44).
("Accelerator
(front)" on page 40).
("Drive cage assembly
2" on page 58).
("Accelerator option
("Drive
cabling" on page 91).
Removal and replacement procedures 64
bracket" on page
cabling"

Advertisement

Table of Contents
loading

Table of Contents